
LNG facility model for Gazprom
Task. To make a model with a ship floating on real water for Gazprom. The model was made for participation in the exhibition "Gas Forum" in EXPOFORUM.
Project information. Model dimensions 3000х3000 mm. Production time: 2 months. Detalization: high.
Additional option. Making a bath, which was filled with real water. Inside the bath a complex mechanisms that determined the trajectory of the ship were provided. In addition, there are many other interactive elements on the model, such as: - running fan systems at the emergency extension system;
- filling and emptying tanks;
- gas flow through pipes;
- work of port valves when filling gas in a tanker;
- lighting inside the objects, and lighting of the plant.
Project information. Model dimensions 3000х3000 mm. Production time: 2 months. Detalization: high.
Additional option. Making a bath, which was filled with real water. Inside the bath a complex mechanisms that determined the trajectory of the ship were provided. In addition, there are many other interactive elements on the model, such as: - running fan systems at the emergency extension system;
- filling and emptying tanks;
- gas flow through pipes;
- work of port valves when filling gas in a tanker;
- lighting inside the objects, and lighting of the plant.
Order free payment now!
Within 1 hour you will receive a commercial offer
Calculate the model
Related models: